Mazda LF Manuale Utente Pagina 24

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 30
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 23
Technical Training
LF 2.0L & L3/L3T 2.3L Engine Timing 24 Updated: 6/26/2008
10. Use a 23mm open end wrench to hold the intake camshaft hexagon. Torque the camshaft
bolt (15mm) to 69-75 Nm (50.9 – 55.3 ft-lbs).
11. Apply RTV silicone sealant to the timing cover to areas A and B in the correct thickness.
A = 2.0 to 3.0 mm (0.079 to 0.118 in)
B = 1.5 to 2.5 mm (0.059 to 0.098 in)
C = None
LF/L3
L3T
Vedere la pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 30

Commenti su questo manuale

Nessun commento